Thanks for all the help with the bridge work today. We were able to place and install one bridge and a boardwalk. The boardwalk is open and the bridge AND JUMP should be ready to roll next week. Leaves have been mostly cleared. Kaplan’s is looking great. As always, have a good ride. OTA.